Tuesday, February 26, 2008

Delays....






Here's the latest photo. Now, there are some details to clean up and they aren't minor. The ramada failed inspection since the roof wasn't built according to the plan. They've had to send the plans back to engineering to be updated before they can shingle and tile the roof.


And, the hot tub has a gigantic leak somewhere. It's likely in the pipes that run under the deck. The newly filled spa and pool are all murky and the spa is draining water into the yard.


Oh--and there are tire tracks through part of the deck and one section of deck is cracked.


Will this job ever be complete? I'm starting to think this wasn't worth it at all.

Thursday, February 14, 2008

The Deck


Now, the deck has been poured. What a relief! It's beautiful, but you can't really tell from this picture. The workers had no regard for keeping things even moderately clean. They left stuff EVERYWHERE! They even picked oranges off our tree and left the peels all over the place. Oh well. At least the deck is gorgeous. They've left now and I need to post a new photo of the finished, cleaned up product.


We met with a landscaper today and they were prepping the pool for pebble tec. The wrought iron is here and needs to be installed and the masons were waiting on an inspection in order to begin the ramada roof.

Wednesday, February 6, 2008

Progress Update

So, Kory hasn't been seen or heard from since I talked with Amy on January 21st.

We've talked with Dulce several times and each time, she has said that forming for the deck and pouring of the deck is about to happen. Well, the deck people were here today and we took time off of work to make sure everything was going as planned. It's a good thing we did that.

Turns out that some of the plumbing for the pool was in the way of the deck. The plumbers came over and cut the pipes and left. Now, plumbing repairs need to be made. And, the fill dirt had been put up close to the house instead of in the ramada where it is needed. And, there wasn't enough fill dirt in the yard. Of course, the masons already put up the exterior block wall, so the deck guys are using a tiny, little tractor to move little piles of dirt into the yard.

And, Shane and I found out that the electrical for the lighting in the stairs has not been run. Nor has the sleeve for the plumbing to the planters. The masons had told us that the deck guys would do this and the deck guys said that they weren't responsible for it. The deck supervisor called Kory and he said he'd take care of it tomorrow. He'd better, because the deck is supposedly being poured on Friday no matter what.

In addition, there are chipped tiles and crumbling or non-existant grout around the edges of the pool.

Who knows what will happen next???